Critical speed calculation of a refurbishment of 11MW hydro power plant unit

Ahmet Selim Pehli̇Van, Dario Kraljevic, Ivan Triplat, Beste Bahçeci

Research output: Contribution to journalArticlepeer-review

Abstract

Hydro generator design is a significant issue in terms of safety, efficiency, and energy production sustainability. One of the most crucial issues about design criteria is to satisfy the needs of the project’s critical speed. In this work, the critical speed calculation of an 11 MW hydro power plant was investigated with several design steps. Numerical solution methodologies were implemented using ARMD™. A generator design was developed, and the implementation of the rotor was carried out in Antalya, Turkey. Vibration and displacements of the hydro generator are adequate. The generator unit is active for 3 years and have never encountered runaway speeds. No critical speed or resonance speed is anticipated for the designed hydro generator unit.

Original languageEnglish
Pages (from-to)644-658
Number of pages15
JournalTurkish Journal of Electrical Engineering and Computer Sciences
Volume30
Issue number3
DOIs
Publication statusPublished - 2022
Externally publishedYes

Keywords

  • FEM
  • Hydro unit rotor
  • critical speed
  • resonance
  • rotor dynamics